• Home
  • About us
  • Services
  • Projects
    • Gabal Asfar
    • Al-Mostakbal
    • Helwan
    • Mahalla
    • Alexandria
    • Katamia Club
    • Hayat Karima- Qaluibia
    • Hayat Karima- Faiyum 1
    • Hayat Karima- Faiyum 2
  • Gallery
  • Contact us
  • More
    • Home
    • About us
    • Services
    • Projects
      • Gabal Asfar
      • Al-Mostakbal
      • Helwan
      • Mahalla
      • Alexandria
      • Katamia Club
      • Hayat Karima- Qaluibia
      • Hayat Karima- Faiyum 1
      • Hayat Karima- Faiyum 2
    • Gallery
    • Contact us
  • Home
  • About us
  • Services
  • Projects
    • Gabal Asfar
    • Al-Mostakbal
    • Helwan
    • Mahalla
    • Alexandria
    • Katamia Club
    • Hayat Karima- Qaluibia
    • Hayat Karima- Faiyum 1
    • Hayat Karima- Faiyum 2
  • Gallery
  • Contact us

Alexandria West WWTP Extension and Upgrading

Project Details

  • Project name: Alexandria West WWTP Extension and Upgrading (400000 m3/day primary treatment to 600000 m3/day secondary treatment)
  • Client name: EIB (European Investment Bank) –CAPW 
  • Project Duration: (2017 – 2018) 
  • Team Members Involved in this project:  Deputy team leader, data collection team, samples collection, wastewater analyses, flow measurement team, inception report preparation, mechanical experts, civil design experts, ESIA study, coordination of activities and presentation to stake holders as well as donors.

Project Highlights

This project included feasibility study to extend an existing primary wastewater treatment plant from 400000 m3/day up to 600000 m3/day secondary treatment including sludge digestion and dewatering facilities.

Key Project Issues

  • To conduct an accurate feasibility study allowing for financing program and agreement, data collection about the exact expected served population, water demand, water availability wastewater collection system, assessment of the existing facilities, wastewater samples collection, wastewater analyses, flow measurement , boreholes /soil report management inception report preparation, mechanical experts, civil design experts, ESIA study, as well as  coordination of activities and presentation to stake holders as well as donors were jointly performed by INFRA Engineering.

Introduction

An existing primary treatment of capacity 40000 m3/day was requested to be extended up to the desired capacity (to be determined by the study) with full assessment of the different treatment processes and sludge handling options together with full assessment of the financial requirements for upgrading of the existing facilities as well as the extension units.

Design/ Design review

Review of master plan for wastewater collection, design of the required extension facilities after selection of the treatment process, boreholes and soil report management as sub consultancy, full detailed priced mechanical and civil B.B.Q. preparation.

Construction Supervision

Feasibility Study prior to Tender documents preparation