• Home
  • About us
  • Services
  • Projects
    • Gabal Asfar
    • Al-Mostakbal
    • Helwan
    • Mahalla
    • Alexandria
    • Katamia Club
    • Hayat Karima- Qaluibia
    • Hayat Karima- Faiyum 1
    • Hayat Karima- Faiyum 2
  • Gallery
  • Contact us
  • More
    • Home
    • About us
    • Services
    • Projects
      • Gabal Asfar
      • Al-Mostakbal
      • Helwan
      • Mahalla
      • Alexandria
      • Katamia Club
      • Hayat Karima- Qaluibia
      • Hayat Karima- Faiyum 1
      • Hayat Karima- Faiyum 2
    • Gallery
    • Contact us
  • Home
  • About us
  • Services
  • Projects
    • Gabal Asfar
    • Al-Mostakbal
    • Helwan
    • Mahalla
    • Alexandria
    • Katamia Club
    • Hayat Karima- Qaluibia
    • Hayat Karima- Faiyum 1
    • Hayat Karima- Faiyum 2
  • Gallery
  • Contact us

Hayat Karima- Youssef Elsedeek - Faiyum

Project Details

  • Project name: Hayat Karima- Youssef Elsedeek - Faiyum Governorate  
  • Client name: National Organization for Potable Water & Sanitary Drainage (NOPWASD)
  • Project Duration: (2021 – 2022) 
  • Team Members Involved in this project: All departments were involved: Hydraulic & process, electromechanical, structural, Arch, and administrations

Project Highlights

Extended aeration Activated Sludge process was standardized for application as follows: -


El Hamouli Extension WWTP is designed for a total average flow of (10000 – 15000) m3/day. This project serves the following village: 

  • El maqrani - Rawaq Shaalan - Wadi el rayan 


 Quota WWTP is designed for total average flow of (5000 – 10000) m3/day. This project serves the following villages: 

  •  Ali basha el robi -  Qaroon  Mousa mezar -


Youssef Elsedeek WWTP is designed for total average flow of (5000 – 10000) m3/day. 

This project serves the following villages: 

  • Ali basha el robi  - Qaroon  Mousa mezar

  

Batn Ehreet WWTP is designed for total average flow of (10000 – 20000) m3/day. 

This project serves the following villages: 

  • El msharq qebly - El mshraq bahry  - Batn ehreet   - El rwashdeya w abo lteaa    

Key Project Issues

The following activities were performed: Data collection, preliminary design, process calculation sheet, hydraulic water calculation sheet, hydraulic sludge calculation sheet, layout. -

  • Design units of WWTPs (Civil Guide drawing)
  • Inlet chamber, Screening chamber
  • Aerated Grit removal chamber
  • Aeration Tank
  • Chlorine Contact Tank
  • Final Sedimentation Tank
  • Sludge Thickener
  • Drying beds
  • Design units of WWTPs (Electromechanical drawing)
  • Return & Excess pumping station
  • Thickened sludge pump 
  • Supernatant
  • Air Blower 

Introduction

Hayat Karima is a new Presidential Program for village development in Egypt. INFRA Engineering was in charge of carrying out all relevant project activities (Faiyum Governorate). This project includes the following: El Hamouli Extension WWTP, Quota WWTP, Youssef Elsedeek  WWTP, Batn Ehreet  WWTP.  

Design/ Design review

Complete approval of full package of Civil guide drawings, E/M drawings, SLD, detailed construction drawings (arch.& structural).

Construction Supervision

Technical support covering different engineering specializations including project management, civil, mechanical, electrical, control and surveying. 