This project includes evaluation of an existing swimming pool that suffer from differential schmeat conditions, soil studies, material testing, evaluation of structural element, decision making, complete redesign for construction of new swimming pool of dimension 30×50M separated into tow compartments (training – competition) with new innovative foundation system to avoid settlement and seepage of ground water under the new pool.
An existing primary swimming pool requested for evaluation from differential schmeat conditions, soil studies, material testing, evaluation of structural element, decision making, complete redesign for construction of new swimming pool of dimension 30×50M separated into tow compartments (training – competition) with new innovative foundation system to avoid settlement and seepage of ground water under the new pool.
Review and complete redesign for construction of new swimming pool , with new innovative foundation system to avoid settlement and seepage of ground water under the new pool.
Technical support covering different engineering specializations including project management, civil, mechanical, electrical, control and surveying.